09-29
Yancheng digital industrial park exhibition hall net frame covers an area of 1766 square meters. Construction method adopts the construction method of …
MORE09-29
Guangdong zhaoqing xiaopeng new energy automobile grid stamping workshop covers an area of 20566 square meters. This project has a large span and a lar…
MORE05-31
Sichuan xuanhan bus station net frame main body completed, thanks to xuzhou huiteng steel frame support! Happy cooperation.
MORE03-30
With the development of road transport, road transport capacity is improving, bus station construction increase. Xuzhou huiteng network frame sichuan d…
MORE12-02
Xinjiang sha car net frame recently completed successfully. Xuzhou frame processing on the choice of phaeton steel structure.
MORE11-22
Xuzhou phaeton steel structure engineering co., LTD. Mainly in the processing of the grid rack, grid rack accessories. Bolt ball, etc., these years con…
MORE
Huiteng News
/ NEWS
Yancheng digital industrial park exhibition hall grid
2019-09-29Guangdong zhaoqing xiaopeng new energy vehicle grid stamping workshop
2019-09-29Sichuan xuanhan bus station frame main body completed
2019-05-31Dazhou xuanhan bus station network began to enter
2019-03-30
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing