With the development of road transport, road transport capacity is improving, bus station construction increase. Xuzhou huiteng network frame sichuan dazhou xuanhan bus station network frame enter the project a total of 6868 square span large beautiful shape is divided into 3 areas of network frame cantilever 11.5 meters
Prev:Sichuan xuanhan bus station frame main body completed
Next:Xinjiang sha car net frame completed smoothly |
Back to list |
Huiteng News
/ NEWS
Yancheng digital industrial park exhibition hall grid
2019-09-29Guangdong zhaoqing xiaopeng new energy vehicle grid stamping workshop
2019-09-29Sichuan xuanhan bus station frame main body completed
2019-05-31Dazhou xuanhan bus station network began to enter
2019-03-30
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing