1. Materials for building materials.
2. Whether the pad iron under the bottom plate of the column or beam is stable; Whether the column and beam are vertical; Whether the bolts are tightened, etc.
3. Whether the space of column bottom plate and foundation top surface should be poured twice.
4. Whether the connecting bolts conform to the standard.
5. whether there is unqualified weld.
6. besmear brushs of times number and thickness whether accord with relevant regulation.
7. Whether the steel structure should be rustproof and corrosion-proof.
8.after the installation of color board, whether to do waterproof wall board joints.
Prev:Common problems in steel structure construction
Next:No more |
Back to list |
Huiteng News
/ NEWS
Yancheng digital industrial park exhibition hall grid
2019-09-29Guangdong zhaoqing xiaopeng new energy vehicle grid stamping workshop
2019-09-29Sichuan xuanhan bus station frame main body completed
2019-05-31Dazhou xuanhan bus station network began to enter
2019-03-30
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing