When carrying on net to wear processing, need to carry out according to make standard, want to avoid violate regulations to operate, in processing process, which two kinds of hoisting method that net wear USES? Share in detail below:
First, the altitude assembly method
The steel frame is installed with the high-altitude assembly method, which firstly sets up the assembly bracket at the design position, and then USES the crane to hoist the members of the steel frame to the design position in the air and assemble them on the bracket. This method sometimes does not need large lifting equipment, but assembly bracket consumption is large, high altitude operation. Therefore, it is more suitable for steel grid made of shaped steel or steel tube with bolt ball joints.
Ii. Integral installation method
Integral installation method is put together on the ground first namely whole, lift equipment lifts its whole to design position next try to fix. This kind of construction method does not need the tall assembling support, the high altitude work is less, easy to guarantee the welding quality, but needs the lifting equipment with large lifting weight, the technology is more complex. Net frame processing manufacturer tells everybody, this law is more appropriate to the steel net frame of ball node. According to the different equipment used, the whole installation method is divided into multi-machine lifting lifting method, pull bar lifting method, jack lifting method and jack lifting method.
Prev:Steel structure products
Next:How is the grid piece together |
Back to list |
Huiteng News
/ NEWS
Yancheng digital industrial park exhibition hall grid
2019-09-29Guangdong zhaoqing xiaopeng new energy vehicle grid stamping workshop
2019-09-29Sichuan xuanhan bus station frame main body completed
2019-05-31Dazhou xuanhan bus station network began to enter
2019-03-30
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing