When net frame is installed in construction, can use ground to go all out outfit or high altitude go out outfit, two kinds of methods are applicable different project, how is net frame when carrying on net to go up to be put together when processing? Grab a look.
The splicing of the network frame is mostly in the phenomenon, before the factory needs to pre-assemble, check the size and deviation of the components, according to the different construction and installation methods, divided into splicing, splicing and overall assembly. If it is a net frame welded with hollow ball joints, the assembling sequence should be correctly selected to reduce the welding deformation. The assembling welding sequence should be from the middle to both sides, and the net frame should be splicing forward, and both ends or front edges can freely shrink.
When the mesh frame is assembled, the lower string is generally welded first, and then the lower string and the upper string are welded. However, if the whole piece is used, the positioning and welding of all the pieces are well. When the whole piece is welded, it is easy to break the positioned weld.
If you do not know how to assemble the grid, you can try the above mentioned method, the grid processing construction, need to be careful and careful, in order to better complete the construction.
Prev:Two kinds of hoisting method of net frame
Next:Screw fastener loose how to do? |
Back to list |
Huiteng News
/ NEWS
Yancheng digital industrial park exhibition hall grid
2019-09-29Guangdong zhaoqing xiaopeng new energy vehicle grid stamping workshop
2019-09-29Sichuan xuanhan bus station frame main body completed
2019-05-31Dazhou xuanhan bus station network began to enter
2019-03-30
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing